All Projects

All Projects

Several Hydro Power Projects are under various stages of development.

SINGOLI BHATWARI HYDROELECTRIC PROJECT

L&T Uttaranchal Hydropower Limited (L&T UHL) is implementing the 99 MW run-of-the-river Singoli-Bhatwari Hydroelectric Project in Uttarakhand. The project was awarded in 2006 on Build, Own, Operate and Transfer (BOOT) basis, after a competitive bidding process by Government of Uttarakhand (GOU). L&T UHL signed the Implementation Agreement with GOU in November 2009.

The project is located on Mandakini River, the right bank tributary of Alaknanda River, in the Garhwal region in Rudraprayag district in Uttarakhand, India. The proposed barrage site is 4 km downstream at the confluence of Mandakini River with Madhyamaheshwar River, near Singoli village. The power generating units would be located near Phalai village in a surface Power House located about 15 kms further downstream on the right bank of Mandakini River.

The Power House of the project is at a distance of 400 kms from Delhi, 165 kms from Rishikesh and about 25 kms from Rudraprayag.

The project involves construction of a 22 m high barrage, 11.26 km long head race tunnel of 4.9 m diameter, an orifice type surge tank, steel-lined pressure shaft and a surface powerhouse. Three Francis turbines of 33 MW each located inside the surface Power House will be used to generate 472.18 million units of energy in a 90% dependable year.

The project has obtained all clearances and has achieved financial closure. All construction contracts executed and construction is in progress.

TAGURSHIT HYDROELECTRIC PROJECT

L&T Arunachal Hydropower Limited (L&T AHL) is implementing a 74 MW run-of-the-river project in Arunachal Pradesh. The project is located on Tagurshit River, a tributary of River Siyom, in West Siang District of Arunachal Pradesh, India.

SACH KHAS HYDROELECTRIC PROJECT

L&T Himachal Hydropower Limited (L&T HHL) is implementing the 267 MW run-of-the-river Sach-Khas Hydroelectric Project in Himachal Pradesh. The project is located on Chenab River in the Chamba District. The project was awarded to L&T PDL in 2009 on Build, Own, Operate and Transfer (BOOT) basis.

REOLI DUGLI HYDROELECTRIC PROJECT

L&T Himachal Hydropower Limited (L&T HHL) is implementing the 430 MW run-of-the-river Reoli-Dugli Hydroelectric Project in Himachal Pradesh. The project is located on Chenab River in Lahul Spiti District. The project was awarded to L&T PDL in 2011 on Build, Own, Operate and Transfer (BOOT) basis.

MoreLess